TP-LINK CPE210 Guida Utente Pagina 38

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 77
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 37
Pharos Control User Guide
35
Completed: The total number of the completed upgrade
operations in the list
below.
Failed: The total number of the failed upgrade operations in the list below.
Name:
Displays the name of the upgrade operation distinguished by the
time it was carried on.
Status: Displays the result of the upgrade operation.
Operations:
Clear all the upgrade operation lists in this tab.
Delete the selected upgrade operation entry.
The right window of Section C displays the progress bar of the selected upgrade operation and its
result.
Figure 3-13 Upgrade Status
Entry introduction:
Upgrade: The time when the upgrade operation begins.
Status: The status of the upgrade operation.
Device Name: The name of the selected device.
Progress: The progress of the upgrade operation.
Status: The result of the upgrade operation.
Vedere la pagina 37
1 2 ... 33 34 35 36 37 38 39 40 41 42 43 ... 76 77

Commenti su questo manuale

Nessun commento